PERANCANGAN MANAJEMEN KONSTRUKSI TERMINAL PENUMPANG, PELABUHAN MOA, MALUKU

Gilang Permana Rachman dan Paramashanti
Program Studi Sarjana Teknik Kelautan
Fakultas Teknik Sipil dan Lingkungan, Institut Teknologi Bandung
Jalan Ganesha 10 Bandung 40132
1 gilang.rachman.13@gmail.com dan 2 parama@ocean.itb.ac.id

Abstract: Since 2014 – 2018, The government of Indonesia has succeeded in building around 19 ports throughout Indonesia. In the building process, a good management system is needed, so the goals of the building process can be reached as expected. At this writing, the construction of Moa Port will be designed. There are 2 alternative of construction management designs that can be applied to this port. That alternatives are 2 trestles are worked in series (alternative one) and 2 trestles are worked in parallel (alternative two). The scope of management design at this writing includes analysis of construction method, calculation of work volumes and their productivities, scheduling, and calculation of construction costs. The construction management design for alternative one and alternative two then will be compared in all those design scopes.
Keywords: management, construction, port, budget, scheduling.

Loader Loading...
EAD Logo Taking too long?

Reload Reload document
| Open Open in new tab

Download [592.27 KB]